Bricesco

Pyrolysis Gasifier Units

nes

Location
Bristol , UK
Product
Energy to Waste
Specification
8 x Twin Chamber Pyrolysis Units
Value
Circa £3.5 million
Description
Contracted to Third Party Design to Fabricate, Insulate with Low Thermal Mass Ceramic Fibre & High Density Refractory Castable , Install and Commission.
In House Source
Fabrication
Refractory Casting
Ceramic Fibre Lining
Assembly
Installation
Commission