– EN1090 Execution Class 1 to 3 – Qualified Welders to BS EN ISO 9606-1:2017 – Carbon Steel Welding to BS EN ISO 15614-1:2017 – Stainless Steel Welding to BS EN ISO 15614-1:2017 level 2 – Aluminium Welding to BS…
As Bricesco continue to expand its operations we are delighted to announce the arrival of two new experienced employees
Rafal Wodzinski has joined the team as Design Engineer on a permanent basis following a successful period working with us as a contractor, whilst Paul Terry has commenced his employment as Buyer. Rafal has a wealth of 3D design /…
Bricesco is pleased to confirm completion of relocation to NEW PREMISES
Bricesco is pleased to confirm completion of relocation to new premises. Unit 101 Axcess 10, Bentley Road South Wednesbury West Midlands, WS10 8LQ The modern 2000 sq.m unit, conveniently located within 1 mile of M6 Junction 10, is the new…
Recently Commissioned Electric Furnace
1cu.m capacity 90KW Installed Power Operating Temperature 1150°C Maximum Temperature 1250°C Temperature Distribution ±3°C to AMS2750E Ramp Rate 8°C per hour Single Zone Thyristor Control Fully Interlocked Safety System Two Automatic Vertical Lift Doors Automated Twin Bogie Arrangement Bricesco specialise…
New Contract with Global Leader in the Metal Recycling sector
Bricesco Engineering Division have been awarded a new contract by a Global Leader in the Metal Recycling sector to fabricate a 25 Tonne Support Structure. With further live projects for this prestigious customer, with multiple UK locations, already quoted it…
New contract to design, supply, install and commission 10m long Electric Annealing Furnace
BRICESCO continue to be recognised as a leading UK supplier of Heat Treatment Furnaces to the Metallurgical Industry. A new contract to design, supply, install and commission a 10m long Electric Annealing Furnace to a UK based Global Organisation enhances…
Significant Bespoke Fabrication Project contract secured to supply one of the UK’s leading Water Industry contractors
Bricesco Engineering Division has secured a significant contract to supply one of the UK’s leading Water Industry contractors with a Bespoke Fabrication Project. The In House capability to manufacture this sectionalised Stainless Steel Fabrication to industry quality standards and provide…
Bricesco have secured a prestigious contract for the supply of TWO furnaces for export to USA
Fundamental to the customers decision process was the ability of Bricesco to deliver the project within minimal lead time. Bricesco spokesperson commented that as the oldest kiln and furnace manufacturer in the UK this contract evidences Bricesco’s continuing ability to supply…
Completion of bespoke engineering solutions for a ‘no touch policy’ health and safety review for global metal production company
Bricesco is pleased to have completed and implemented bespoke engineering solutions for a ‘no touch policy’ health and safety review, assisting a global metal production company in achieving their targets.
Delivery of Fully Trialled and Tested Electric Furnace Prior to Despatch
Bricesco are pleased to have delivered to Eastern Europe, an electric furnace fully trialled and tested prior to delivery to despatch, enabling plug and play for our customers convenience thus minimising any downtime for their production.